Coffee Table
For Best Results - Do not throw away packaging materials until assembly is complete. - Assemble item on a soft surface, such as cardboard or carpet, to protectnish - Proper assembly requires two people. Tools Required Stuck? Questions? We are here to help.
Included in this Package 1 6 3 1 Top Board x1 2 Base Board x1 3 Backplate x1 4 Central Side x1 5 Left Side x1 6 Right Side x1 7 Drawer Front x2 8 Right Side Drawer x2 9 Left Side Drawer x2 10 Back Panel of Drawer x2 4 11 Bottom of Drawer x2 12 Foots x4 13 Foot Structure x1 2 13 5 2x 8 10 11 7 9 12 12 12 12 A B C 30mm Wooden dowel x 20 12mm Screw x 20 40mm Screw x 17 D E F 12mm Screw x 8 60mm Bolt x 8 Metal dowel x 19 G H J Locking nut x 19 Drw Handle x
STEP 1 A 2x 9 8 A 30mm Wooden dowel x 20 A A 2x A 4 A A A A A 5 3 A A A A 6 A A A STEP 2 F Metal dowel x 19 F 7 F F 2x F F 5 F F F F F F 1 F F F 6
STEP 3 a K a L Right Runner x 2 Left Runner x 2 D x8 D D 12mm Screw x 8 K a L D D 6 a 5 Note:the hole position. D D K a D D L a Note:the hole position. 4 TURN OVER THE PART.
STEP 5 12 12 12 13 12 STEP 6 J E Allen key x 1 60mm Bolt x 8 12 13 12 E E 13 12 E E 12 E J
STEP 7 12 12 13 12 12 2 STEP 8 M 35mm Screw x 10 M M M M M 2 M M M M
STEP 9 G Locking nut x 2 6 G 3 G G 5 STEP 10 C 40mm Screw x 9 4 C C C 2 C C C C C C C
STEP 11 G Locking nut x 9 1 G G G G G G G G G G STEP 12 G Locking nut x 8 2x 8 G G 9 10 G 7 2x 11
STEP 13 C C 40mm Screw x 8 2x B 12mm Screw x 4 H Drw Handle x 2 C 2x H B H B STEP 14 B 2x 12mm Screw x 20 K B IN FLUSH K b Right Runner x 2 b L B b Left Runner x 2 B L b B B L b Note:the hole position.
STEP 15
STEP 16 B 12mm Screw x 8 B B