Instruction manual
Setup & Installation
Component List
56 MultiMode SPM Instruction Manual Rev. B
3.2.3 System Power Up
Prepare the System for Power-up
1. Verify that the power cord is plugged into a grounded power receptacle.
2. Verify the following electrical requirements:
• 1.8W; single phase
• 100V, 120V or 240V duplex outlet
• dedicated circuit
• 50/60Hz
3. Verify that all cables are connected properly, especially the NanoScope III SPM controller to
the computer.
Power-up Sequence
1. Turn on the computer using the push-button switch located on the front of the computer.
2. Turn on the monitors (2) using the push-button switches located on the front of the monitors.
3. Turn on the NanoScope III controller using the power switch located on the rear of the
NanoScope III controller.
CAUTION: The following section is required only during installation or after
servicing and should NOT be used by untrained personnel.
CAUTION: Cables should not be removed or installed while power is applied to
the system. These restrictions do not apply to the small black cable
that connects the microscope head to the stage control electronics.