Technical data

Programming the Smartline Pump 1000 27
01 L2 No** P - - R - - Wait-
OFF
Load Edit Prog Flow Pressure Events
Prog Clear 0 [ml/min] [0.1 Mpa] off 0 on 1
2
Hold 0 Time %A%B%C%D
Run 1 [min]
Setup
GLP
Link
Vie
w
A
01 L2 No01 P07 R05 Wait0
OFF No** P - - R - - Wait-
Load Edit Prog Flow Pressure Events
Prog Clear 0 [ml/min] [0.1 Mpa] off 0 on 1
2
Hold 0 Time %A%B%C%D
Run 1 [min]
Setup
GLP
Link
Vie
w
B
Fig. 19 Display while editing a program link
During the execution of a link, the LINK menu is available in addition to
the common display. Within the LINK menu the current status of the
running link is shown. Move the cursor to the LOAD PROG field and
press the ½ key to enter this menu page. For more information refer to
Fig. 10 on page 17.
Press the ¾ key to exit link menu.
SOP 19 Executing Program Links
This SOP applies to the Smartline Pump 1000 Firmware Version 1.0X or
higher.
1. Enter the desired link number into the field LOAD PROG and
confirm by pressing any arrow key.
2. Press START to start the pump. The display switches to ON.
3. Position the cursor on the ON field.
4. Start the link by pressing numeric key 1. The display switches to
RUN.
After execution of a link the Smartline Pump 1000 stops solvent delivery
and the display switches to OFF.