Specifications
Vancouver Police Service
Command
Production Specification
SVI #847 Page 9 of 107 September 18, 2012
OPERATIONS AND SERVICE DOCUMENTATION
The Contractor shall deliver with the fire apparatus at least two (2) sets of complete operation and service documentation
covering the completed apparatus as delivered and accepted.
The documentation shall address at least the inspection, service, and operations of the fire apparatus and all major
components thereof.
The Contractor shall also deliver with the fire apparatus the following documentation for the entire apparatus and each
major operating system or major component of the apparatus:
1) Manufacturer’s name and address
2) Country of manufacture
3) Source for service and technical information
4) Parts replacement information
5) Descriptions, specifications, and ratings of the chassis, pump (if applicable), and aerial device (if applicable)
6) Wiring diagrams for low voltage and line voltage systems to include the following information:
a) Pictorial representations of circuit logic for all electrical components and wiring
b) Circuit identification
c) Connector pin identification
d) Zone location of electrical components
e) Safety interlocks
f) Alternator–battery power distribution circuits
g) Input/output assignment sheets or equivalent circuit logic implemented in multiplexing systems
7) Lubrication charts
8) Operating instructions for the chassis, any major components such as a pump or aerial device, and any auxiliary
systems
9) Precautions related to multiple configurations of aerial devices, if applicable
10) Instructions regarding the frequency and procedure for recommended maintenance
24) Overall apparatus operating instructions
11) Safety considerations
12) Limitations of use
13) Inspection procedures
14) Recommended service procedures
15) Troubleshooting guide
16) Apparatus body, chassis and other component manufacturer’s warranties
17) Special data required by this standard
18) A material safety data sheet (MSDS) for any fluid that is specified for use on the apparatus
The Contractor shall deliver with the apparatus all manufacturer's operations and service documents supplied with
components and equipment that are installed or supplied by the Contractor.
NFPA REQUIRED DOCUMENTATION FORMAT - CD-ROM
The vehicle construction details and the operations and service documentation as required per NFPA 1901 latest edition
shall be provided on a CD-ROM. These manuals shall be divided into sections for ease of reference. There shall be two
(2) copies of the CD-ROM provided with the completed vehicle.
There shall be three (3) printed copies of the manual provided with the apparatus.










