Installation Instructions

16
Instructions for the installer
3.4 - BOILER LOCATION INSIDE A BOILER ROOM
Special attention shall be paid to local regulations and laws
about boiler houses and particularly to the obligation of keeping
minimum clearances and empty space around the boiler. The
installation shall be in compliance with all latest regulations and
laws about boiler houses, installations of heating and hot-water
systems, ventilation, chimneys capable of evacuating the flue
gases of condensing boilers and any other applicable require-
ment.
The boiler can be put on a flat and sufficiently strong base with
the same dimensions as the boiler ones and at least 100 mm
high (see fig. 2), in order to assemble the condensate drain
siphon. An alternative to this base may be a 100mm deep well
next to the boiler as siphon housing (see fig. 2). After installation
the boiler shall be perfectly horizontal and stable, to reduce any
possible vibrations or noises.
- Remove the casing of the boiler
- Lift the boiler with a hoist or forklift bands
- Remove the 4 screws’’A’
- Insert the 4 feet (contents into the box)
- Attach the feet to the chassis by 4 screws’’A’’previously
removed.
- Place the boiler on concrete slab and mount the casing.
3.3 - REMOVAL FROM THE BOILER BED AND INSERT FOOT
1
2
3
4