Operating instructions

4. Calibration
page 31
Mercury Instruments
UT-3000-E_V2.11.docx
31.07.12
Analytical Technologies
4.3 Perform Span Check
If
F3- Perform Span Check is selected in the Calibration Mode menu a manual span check can
be performed. A calibration unit (see 4.4.2) has to be connected by cable (Pt100), this tells the
analyzer the mercury concentration of the calibration gas.
After pressing the F3-button the analyzer will be prepared for the span check by the standard
cleaning routine of GoldTrap : Zeroing / Trap cleaning / Trap cooling / Zeroing / Trap
cleaning / Trap cooling / Zeroing / System Evaluation / Trap cooling.
Then a volume of calibration gas has to be injected into the calibration port on the front side of
the analyzer. The volume (1-999 ยตl) has to be typed in and confirmed by pressing ENT.
4.4 Perform New Calibration: Manual Calibration