Operating instructions
2. Installation
page 14
Mercury Instruments
UT-3000-E_V2.11.docx
31.07.12
Analytical Technologies
2.4.2 Connection of an Automatic Calibration Unit
If an Automatic Calibration Unit is installed together with the UT-3000, both
instruments have to be connected before starting operation.
a) Use the connecting cable which has two 4-pin round plugs and plug it into the sockets on
the rear side of the instruments marked “Temperature” and “PT100”.
b) Take the cable with the 9-pin DSUB plugs. Identify the plug labelled “UT-3000” and
connect it to the RS232 socket on the rear side of the UT-3000. Identify the plug labelled
“Calibration unit” and connect it to the RS232 socket on the rear side of the Automatic
Calibration Unit.
F
IGURE
:
B
ACK SIDE OF
UT-3000
(
UPPER
)
AND
A
UTOMATIC
C
ALIBRATION
U
NIT
(
LOWER
)
WITH CONNECTION
TUBING
,
P
T
100-
CABLE AND
RS232-
CABLE