Installation manual
IR Speed Dome Installation Manual  
11 
4. Cover the sealing ring and tie the safety lanyard to the dome. 
Note: The sealing ring must be set for the dome’s waterproofing. 
Figure. 1.2.9 Cover the sealing ring 
Figure. 1.2.10 Tie the safety lanyard 
5. Hang the IR speed dome’s hanging hook to the top cover. Then, connect the integrated cable into the appropriate slots by suggestive 
identifying information near the slots. The circuit interfaces on the bottom board are shown in figure 1.2.12(the bottom board of IR 
speed dome), 1.2.13(the bottom board of network IR speed dome), 1.2.14(the bottom board of network high-definition  IR  speed 
dome). 










