Instructions / Assembly

10
Assembly Instructions
A. Slide brine nut over end of brine tube. Insert brine tube bushing/lter screen into the end of brine tube.
B. Insert brine tubing into brine line connector.
C. Tighten hexagonal nut onto brine line connector.
STEP 4: Connect Brine Line to the Control Valve
STEP 5: Connect backwash drain line to control valve
A. Slide drain hose connector into drain outlet.
B. Insert drain line ow control into drain outlet.
C. Attach clear drain tubing to connector. Secure
using a hose clamp (from Owner’s Manual Zip-
lock Bag.)
D. Secure the clear drain tubing over a oor drain
or other suitable drain. Leave an air gap of
about 1 1/2” between the end of the hose and
the drain. An air gap is necessary to prevent
backow of sewer line.
Drain Outlet
Drain line
ow control
Clear drain tubing
Clip
Drain hose
connector
Note: There is one 10’ length of clear drain tubing provided. This tubing will need to be cut to be used for both
backwash drain line from control valve and overow drain line from brine tank. You should measure the length you
need for the backwash line from the resin tank rst, using the remainder for the brine tank overow line.
Air gap to drain
Brine tube
Brine Nut
Bushing/Filter Screen
Brine line connector
Brine line ow control
O-ring
Clip