Instructions / Assembly
5
FTF01 Rev.2 042019
Luxier
Installation
1
2
4
4-1
4. With the Tub Filler Assembly aligned in the desired
position, mark each of the 4 mounting holes from the
Mounting Flange (1) on the oor.
4-1. Use a drill with 1/4” drill bit, drill the holes 1 3/4” deep
and insert the included Anchors (2). Make sure the Anchors
are ush with the nished oor.
5. Make sure both Hot and Cold water supply hoses pass
through the 2” mounting hole with at least 1 1/4” of the
hose in the oor space.
1/2 " Supplies Hoses
Hot Cold
1 1/4”
Finished Floor
Sub-Floor
HOT
COLD
5
pipe support
1
water pipe
water pipe
6
6. Apply PTFE tape to the threads of the T-Connector (1)
and the 2 Thread Adapters. Connect the 2 adapters to the
T-Connector (1) and tighten fully. Secure pipe below oor
to oor joist with pipe supports. Connect the 2 water supply
hoses to the T-Connector (1) and use an adjustable wrench
to tighten connections. Do not over tighten the connections.