Instructions / Assembly

4
FTF01 Rev.2 042019
Luxier
Installation
1. Insert the RISER TUBE (1) over hot and cold
SUPPLY HOSES (5). Thread the Top RISER TUBE
(1) into base of the VALVE BODY (2) and tighten
it fully. Slide the FLOOR MOUNTING FLANGE (3)
onto the Bottom RISER TUBE with the ange (4).
Thread RISER TUBE (4) into the bottom of RISER
TUBE (1) and fully tighten the tubes.
3. Make sure the oor is level in both directions.
Determine the distance from the nished wall to
the center of the oor water supply hose. Mark the
centerline. Drill a 2” (51mm) diameter hole for the
Hot and Cold water supply hoses.
Insert the water supply hoses through the hole and
place Tub Filler Assembly on the oor and check for
alignment.
Insert SPOUT (1) into faucet body (2) tighten
Setscrew (3) with the supplied small hex wrench
supplied. Insert Handle (4) on the cartridge stem,
tighten the Setscrew (5) and install Cap (6) to the
Handle. (4)
5
1
Top Riser Tube
2
4
Bottom Riser Tube
3
1
1
3
4
5
6
2
Cartridge Stem
2
Level
BASE BOARD
2" Hole
FINISHED WALL LINE
COLD
HOT
Top View
3