Installation Guide
FOR MORE INFORMATION PLEASE VISIT THE TUFFBLOCK WEBSITE:
STEP 8
FILL THE REMAINING POSTS.
Cut posts to length and position them between the oor joist
and the TuffBlock pier. Repeat this step until all posts are cut
and positioned. Next, secure all oor joists and posts using
two 75mm (3 inches) counter sunk batten screws.
STEP 9
ATTACH THE DECKING.
Starting from one side of the deck, attach the rst decking
board so it’s ush to the edge of the deck. The decking
board will overhang the rst oor joist closest to the existing
structure. Leave a 3mm to 6mm (0.125 - 0.25 inch) gap
between the end of the decking board and the edge of the
structure. Next, secure the remaining decking boards as per
manufacturers instructions.