Instructions / Assembly

3
Please watch this video for details: Water Supply Options:
https://www.youtube.com/watch?v=D_md6CufrxY
2. Base PreparationS-3460 Base Preparation: https://youtu.be/ltiGsR16G_I
a. Remove the shower base from its packaging.
b. Spray Polyurethane foams to the back side of the base (clear of the passage of drain
pipes) (let the foam set)
c. Remove all protective covering films from the base.
d. Adjust the feet of the base so that the base is level when lying flat on the ground.
e. For 1-1/2” using the drain piece provided: Check e-j. Remove the plastic tubing and
unscrew the top from the white plastic drain.
f. Place the top portion into the drain hole in your base.
g. Apply silicone sealant to the bottom portion of the white plastic drain (about ¼” from
the edge of the rim) and place it over the drain hole from the underside of the base.
h. Screw the top of the plastic drain into the bottom until tight. Do not over tighten as
this may crack the plastic.
i. Reattach the plastic piping to the plastic drain. The flexible drain pipe may Kink at the
turns and to cause slow drainage. Polyurethane foam may be used at the turn to
prevent the pipe kink.
j. Extend the flexible hose and feed it into the floor drain. You may use 1-1/4” to 2”
coupling to secure the drain hose to your floor drain.
k. For 2” drain, simply hard-plumb the 2” drain with PVC pipe to the base. The base is
set and secured to its designed location.
3. Front Frame Assembly: connection of big stiles to tracks
a. Assemble the front frame of two front panels and two straight door tracks.
b. It is recommended to work on a big working table covered with a soft blanket
c. The wide track is the bottom track and narrow track is the top. Each track has an U
groove for door rollers.