Instructions / Assembly
Screw B x 6
Combine the Tread, Riser and Stair Hanrails, secure
with 6pcs Screw B.
5
Screw C x 4
Connect the Slide section with Tunnel section,
secure with 2pcs Screw C at the bottom, and 2pcs
Screw C in the upper part.
Install the 2 Security Fences on the Tunnel Panel.
Screw C x 6
Connect the Tunnel Platform with 2 Tunnel Panels,
secure with 6pcs Screw C.
Screw G x 1
Screw C x 6
Screw E x 1
Attach the U-Shaped Panel, secure this side with
6pcs Screw C, 1pc Screw G and 1pc Square Screw
E.