Multiplay Tower & Slide USER MANUAL READ AND SAVE THIS INSTRUCTION FOR FUTURE USE
SAFETY & WARNINGS ADULT ASSEMBLY REQUIRED. • • • • • • • • • • • • • Keep these instructions for future reference. This product is intended for indoor, outdoor, family, domestic use only. Place this product on level ground and at least 6.6' away from a fence, building, overhead branches, laundry lines or electrical wires. This product should be placed away from furniture that could cause injury if a fall occurs. Ensure the installation area is ventilated.
PART LIST Slide * 1 Buffer Board * 1 Slide Handrail * 2 Tower Gate * 4 Large Side Panel * 1 U-shaped Side Panel * 3 Tunnel Panel * 2 Round Hole Panel * 3 Large Platform * 1 Small Platform * 1 Pedal * 3 Tunnel Platform * 1 Basketball Rim * 1 Screw A *1 Long Square Screw E * 2 Bridge Fence * 2 Basketball Net * 1 Nut B * 7 Nut F * 2 1 Stair Handrail * 2 Nut C * 50 Square Screw D * 2 Nut G * 18 Plastic Screwdriver * 1
ASSEMBLY Long Square Screw E x 2 Nut G x 18 Screw A x 1 Plastic Screwdriver Step1 Step2 Attach the Slide to the Buffer Board, and secure with Screw A on the back. Nut F x 1 Connect the Handrails together with Long Square Screw E, and then attach the long handrail to Slide, secure with 9pcs Nut G on each side, 18pcs Nut G in total. Tighten with Plastic Screwdriver.
ASSEMBLY Nut C x 6 Nut F x 1 Nut C x 2 Square Screw D x 1 Step7 Step6 Install the Tunnel Panel to the assembled section, and secure with 2pcs Nut C. Attach the U-shaped Side Panel as illustrated, and secure with 6pcs Nut C, 1pc Nut F and 1pc Square Screw D. Nut C x 5 Nut C x 3 Step9 Step8 Attach another Tunnel Plate and secure with 5pcs Nut C. Position Tunnel Platform as illustrated, secure it to the assembled part with 3pcs Nut C. Step10 Install the Bridge Fences and secure with 2pcs Nut C.
ASSEMBLY Nut C x 5 Nut C x 6 Step12 Step11 Attach the U-shaped Side Panel section to the assembled part, secure with 6pcs Nut C. Connect the Round Hole Panel and the Large Platform with 5pcs Nut C. Nut C x 3 Nut C x 2 Step14 Step13 Insert 2 Tower Gates to the bottom of U-shaped Side Panel, secure with 2pcs Nut C. Add the 3rd Round Hole Panel as illustrated, secure with 3pcs Nut C. Step15 Insert the Pedals into the holes in Stair Handrails, and secure with 6pcs Nut B.
ASSEMBLY Nut C x 2 Nut C x 6 Step17 Step16 Attach the stair set to the assembled section, and secure with 6pcs Nut C. Connect the Stair and the U-shaped Side Panel as illustrated, and secure with 2pcs Nut C. Nut B x 1 Step18 Put the Basketball Net on the Rim, and then install the basketball set to the Large Side Panel, fasten with Screw B.