Installation Guide
BASE
As per your choice, you may receive a greenhouse with or without a 
pre-fabricated base kit. Either way, this greenhouse must be secured 
to a firm base.
The Base must be level and square.
Before assembling the greenhouse, you must prepare a proper founda-
tion. Two foundation options are provided in this manual. The con-
crete foundation option is recommended for a stronger installation.
SITE SELECTION
The greenhouse should be placed in an area that receives direct sun-
light and gets shielded from wind.
The surface must be level.
ABOUT THIS MANUAL
LEGENDS
   Steps.
 Follow the steps in alphabetic order, from Step A to Step B,  
1111etc.
   Part No. Each part is labeled with its Part No.
BOLT INSERTION
Several steps in this manual invlove inserting F4 Bolts into the groove 
of Aluminum profiles as a preparation for further installation. Dia-
grams above illustrate how to use such inserted bolts. 
F4 BOLTS AND NUTS
Part No. F4 refers to both the bolt and the nut. In some steps only the 
bolt or the nut will be used and in other steps the whole set will be 
used. Check the specific Part List in each step. 
A
F1
02










