Installation Guide
3. Assembling of Main Frame
Continued
C D
E
F
G
10L
5
10R
5
F4*3
7
Repeat 
four times
10L
F4
F4
10R
Notice
1. Fasten the nuts each time after 
7, 10L, or 10R is connected to 
frames 4, 5 or 6.
2. About step E, F, and G, only 
insert bolt F4 into the grooves. Do 
not screw the nut.
3. About step E, note that each 7 has two 
grooves where F4 bolts will be inserted 
into. The groove facing either side wall of 
the greenhouse is groove a, and the one 
facing either the door or the back wall is 
groove b. In step E, insert 2 Bolt F4 into 
eah groove b, and one Bolt F4 into each 
groove a.
a
b
b
a
Door
a
b
b
a
Side
Top View
15










