Full Product Manual

— SPRAY BOOM ASSEMBLY Instruction #2
PARTS LIST
DESCRIPTION
PART NUMBER
QTY
ITEM
Spray Boom630111
11
25 Gal Spray Boom Bracket
60011012
B 11-34 R60011323
NTL38 P Fitting60011224
N1116 P Nut60011625
Check Valve / Strainer60011726
FT Spray Tip6001182
7
8027 P Nut60011928
5/8" Hose Clamp
60012029
Boom Hose Assembly
600220110
5/16-18 x 3/4" Bolt600114211
4
9
6
8
7
5
3
A
1
2
10
11
2.0 Install Spray Boom Bracket to rear of tank using (2) 5/16-18 x 3/4" Bolts
2.1 Insert Boom Supply Hose Assembly thru Spray Boom Bracket as illustrated
2.2 Snap Spray Boom into Bracket aligning locator holes in boom and bracket
2.3 Install (2) Boom Clamps on end of spray Boom and Tighten Screws
(screws should be at top of spray boom)
2.4 Install Hose Clamp over tubing and press tubing onto NTL 38 P fittings then
tighten Hose Clamps
2.5 Install NTL 38 P fittings thru Boom Clamps and tighten N1116 P Nuts as shown
2.6 Insert check valves into NTL 38 P Fittings
2.7 Insert Spray Tips into 8027 P Nuts and screw nuts onto NTL 38 P Fittings.
WORKHORSE SPRAYERS
®
, a division of Green Leaf, Inc. 9490 N BALDWIN ST FONTANET, IN 47851 www.workhorsesprayers.com 888-433-6631