Installation Guide
5778-7
For EPDM Membrane Roof or Hot Tar Roof
Step 5:
Apply sealant within the square flange outline.
Step 6:
Place vent within the square outline & attach using a 
screw gun or drill.
Step 7:
Required screw:  #10 x 1.5” steel sheet metal screw
Total number of screws required =      (tolerance : 1/2”)
Step 8:
Appy roofing cement over the screws and edge of 
flange.  This is how the keepa vent should look when 
finished.
Page 2 of 2
16
Installation Instructions for KV-12


