Instructions / Assembly
2. Installing Door Hangers
2.1 2.2
Drill 7/32” pilot holes at each mark.
Place one lag screw through the middle hole #1 through
a spacer. Do not fully thighten. Repeat process with holes #2 and
#3. Use a level on top of the rail to ensure it is properly levelled,
then thighten the 3 lag screws.
NOTE Lag screws #4 and #5 will be installed later.
Make sure to align the trolley and the screws
with the holes.
Secure the trolley by tightening both screws.
Repeat with the second trolley.
#1
#2
#4
#3
#5
1.3
1.4






