How to Guide
4 Keystone Step-by-StepKits
Keystone’s Family of Products
COURSE BY COURSE INSTRUCTIONS
After selecting the location of project, excavate the base trench
(182" long x 42" wide). Do not use this excavated material as
backfill. Remove all surface vegetation and debris. Start the
leveling pad at the lowest elevation. Level the prepared
base with 6” of well-compacted granular fill
(ex. gravel, road base, or 1/2" to 3/4" [10 - 20 mm]
crushed stone). Compact. Do not use PEA
GRAVEL or SAND for leveling pad.
Remember to:
• Call 811 to locate utility
lines prior to digging.
• Follow manufacturer’s
instructions and local codes.