Installation Guide
General Information 
Required Tools 
Ryobi CSB123 12 Amp 7-1/4 in. Circular Saw -ToolDepartment
7 in. Diamond-Edge Tile Circular Saw Blade -TileDepartment
Johnson 98 in. Aluminum Cutting Level -ToolDepartment
BRUTUS 1-3/8 in. Tile Hole Saw -TileDepartment
Johnson Rafter Angle Square -ToolDepartment
Arrow Fastener Mini Glue Gun -ToolDepartment
Arrow Fastener 0.25 oz. All-Purpose Clear Mini Glue Sticks (24-
Pack) -ToolDepartment
Gundlach Laminate “J” Roller -FlooringDepartment
 (2) 2 in. Spring Clamp -ToolDepartment
Jorgensen 2 in. x 12 in. Light-duty Bar Clamp -ToolDepartment
Husky 13-1/4 in. Scissors (2-Pack) -ToolDepartment
QEP 5-1/2 in. Extra-Large Grouting Sponge -TileDepartment
QEP 4 in. Economy Grout Float -TileDepartment
QEP 4 in. V-Notch Wall Trowel -TileDepartment
Roberts Cove Base Adhesive Nozzle Applicator-Flooring
Department
Workforce 29 oz. Caulk Gun 
Other Items Needed
Measuring Tape 
Drill 
Level (3 Foot or more) 
Set of saw horses 
4' x 8' piece of plywood(table) 
Denatured Alcohol 
Dust Mask 
Safety Glasses 
Plastic Gloves 
#2 Pencil 
Caulk Gun 
Kit Contents 
Confirm that all parts of this kit have been included 
before beginning installation. 
Safety Guidelines General Information 
Unpacking 
 Use care when opening the box so that you do not 
damage the panels or components. 
 This product is shipped to you or your retail center 
after careful inspection. After purchasing the kit, 
carefully unbox and inspect the product for any 
shipping damage that may have occurred. If damage 
is found, report it immediately. After inspection and during 
installation, 
protect the products from construction damage, by moving them 
to another room or area until ready to install. 
 Do not store the panels outside of 
the original packaging. 
 Please use the model number located on the side of 
the box or the front of this manual when contacting us 
with questions concerning the installation of this unit. 
 Make sure the walls are the correct size and are in 
good condition. Installation of damaged product will 
void the warranty. 
Helpful Hints 
 Read these instructions carefully and familiarize 
yourself with the various parts of the kit. 
 The variety of installations possible for this kit may 
require procedures other than those shown. Ensure 
construction is correctly sized, plumb, and square. 
 Save the large cardboard box along with the panel protective 
sheets for protection of the shower floor or bathtub during the 
installation process 
and to use as a template. 
 Allow sufficient time for the parts in this kit to adjust to 
room temperature. We do not recommend 
installation of this product at temperatures below 50 
degrees. 
 Sawhorses with plywood or (3)2”x12” pieces or a worktable 
are helpful during the installation process. 
 Store unused materials away from the work area to 
prevent accidental damage. 
 If the shower is placed over a garage or on an 
outside wall, care must be taken to ensure that the 
shower is properly insulated from cold temperatures. 
Preparation Tips 
 Measure the width of the back wall installed. 
 This measurement cannot exceed the width 
of the SoterraSlate back panels. If the wall opening is 
too large, other methods or two panels will be 
required to cover the wall. 
 Turn off the hot and cold water supply. 
 Remove faucet handles, escutcheons, filler spouts, 
and/or anything mounted to the wall (i.e. towel bars, 
soap dishes, etc.). 
 Always measure the location of the plumbing cutouts 
from the back wall forward and from the ledge of the 
shower base or bathtub upward. 
 Ensure all plumbing or electrical work inside the walls 
is finished prior to installation of the wall panels. 
 Prepare the area with concrete board. 
Never install our products directly on any structure 
that is, or may become, wet or damp. 
 Trial fit the side panels before you begin. 
 Walls must be solid, plumb, and square within 1/8” of 
true. Shim or trim the opening, as required. This kit 
has been designed with some adjustability for minor 
alignment problems. 
 The mounting surface must be free of dirt, film, 
waxes, or any other residues. 
Tool List 