Instructions / Assembly

1
GRIDSCAPE FIXED PANEL
INSTALLATION INSTRUCTIONS FULL DIVIDED-LIGHT
PREPARATION
Approximate Installation Time: 30 minutes
Tools Required for Installation:
Chop Saw or Hacksaw
Electric Drill
3/16 Masonry Drill Bit
9/64” Metal Drill Bit
Philips Bit
Pencil / Felt Tip Pen
Safety Glasses
Measuring Tape
Masking Tape
Level
Rubber Mallet
Clear Caulking or Sealant
QUESTIONS
Before beginning installation of product, make sure all parts are present. Compare parts with package contents list
and diagram below. Grid appearance may differ from images shown. If any part is missing or damaged, do not
attempt to install the product.
Please call our customer service department at 1-800-874-8601, 8 am - 5 pm EST, Monday to Friday.

Summary of content (7 pages)