Instructions / Assembly

18
5
8
" On
Center
Anchor Bolt
Wall Mount Post
Griffin Instrument
Assembly
A
A
Finished Height
3" Deep,
3/8" Holes
Finished Floor
Griffin Instrument
Assembly
WALL MOUNT INSTALLATION PROCEDURES
Step 1:
Mount the Wall Mount Posts to playing surface at the desired Finished Height,
(
Refer to Finished Height Guideline
) and at 18 5/8" on center. If mounting to
Concrete use the provided Anchor Bolts. Anchor holes should be drilled to a
depth of 3" with a 3/8" Masonry Bit. The same steps 2 and 3 on Sheet 4 can
be used for Anchor Bolt installation. (If anchoring to material other than concrete,
fasteners are to be provided by customer)
Step 2:
Verify the correct placement, levelness, plumbness, and finished height of Wall
Mount Posts.
Step 3:
Lower Instrument onto Wall Mount Posts.
Instrument Holsters should fit snug with little
to no play. Follow instructions on Sheet 6
for fastening Instrument to Mounts.
FINISHED HEIGHT GUIDELINE
Ages 3-5, 39"
Ages 5-7, 43"
Ages 7-11, 51"
Adult, 60"
PROPRIETARY AND CONFIDENTIAL
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF
FREENOTES HARMONY PARK. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
FREENOTES HARMONY PARK IS
PROHIBITED.
FREENOTES HARMONY PARK
194 BODO DRIVE, UNIT F
DURANGO CO 81303
TEL: (970) 375-7825
FAX: (970) 247-0856
EMAIL: INFO@FREENOTESHARMONYPARK.COM
WWW.FREENOTESHARMONYPARK.COM
SHEET 5 OF 6
SCALE: 1:16
GRIFFIN 2016
PRODUCT SHEET / INSTALLATION GUIDE