Instructions / Assembly

6" min.
18 5/8" On
Center
Surface Mounted
Post
4" min.
Anchor Bolt
RECYCLED AND STEEL POST SURFACE MOUNT INSTALLATION PROCEDURES
Step 1:
Determine installation location. Verify concrete footing is a minimum of 6" thick. If the concrete pad is at an angle, steel washers are required to act
as shims. (Shims not provided)
Step 2:
Stand the surface mount post upright onto the concrete pad with a 18 5/8" offset on center. Mark the center of the holes on the surface mount plates.
After you have made your marks, set aside the posts in order to drill for anchor holes. With a hammer or rotary drill, drill through the concrete at
marked locations. Drill to a minimum depth of 4". (
A 3/8" masonry drill bit will be needed
)
Step 3:
Place the surface mounted posts back over the drilled out holes. Insert provided anchor bolts into aligned holes. Position anchor nut so that it is flush
with the top of the bolt. Pound anchor bolts into the hole until the anchor washer is flush with the post base. Tighten anchor bolts until they are snug.
Cover remaining bolt sections with provided plastic caps.
Step 4:
Refer to sheet 6 for installation of instrument to posts.
Step 5:
Verify the correct placement, levelness, plumbness, and finished height of the instrument. Also check for sufficient clearance around the instrument.
A 36" radius is recommended around the instrument for wheelchair accessibility, however this is not required for instrument function. Instrument may
be installed next to a wall or in a variety of different configurations.
PROPRIETARY AND CONFIDENTIAL
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF
FREENOTES HARMONY PARK. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
FREENOTES HARMONY PARK IS
PROHIBITED.
FREENOTES HARMONY PARK
194 BODO DRIVE, UNIT F
DURANGO CO 81303
TEL: (970) 375-7825
FAX: (970) 247-0856
EMAIL: INFO@FREENOTESHARMONYPARK.COM
WWW.FREENOTESHARMONYPARK.COM
SHEET 4 OF 6
SCALE: 1:13
PRODUCT SHEET / INSTALLATION GUIDE
GRIFFIN 2016