Instructions / Assembly

10" Excavated
Hole W/Concrete Fill
18
5
8
" On
Center
Frost Depth
Finished Height
Post Length
FINISHED HEIGHT GUIDELINE
Ages 3-5, 39"
Ages 5-7, 43"
Ages 7-11, 51"
Adult, 60"
RECYCLED AND STEEL POST IN-GROUND INSTALLATION PROCEDURES
Step 1:
Excavate two 10" diameter hole, 36" deep, and 18 5/8" on center at the installation location.
Contractor can modify post to desired height.
Post Length = Frost Depth (36" Recommended) + Finished Height (Refer to Height Guideline)
Step 2:
Lower the posts into the excavated holes.
Step 3:
Refer to sheet 6 for installation of instrument to posts.
Step 4:
Verify the correct placement, levelness, plumbness, and finished height
of the instrument. Also check for sufficient clearance around the instrument.
A 36" radius is recommended around the instrument for wheelchair accessibility,
however this is not required for instrument function. Instrument may be installed
next to a wall or in a variety of different configurations.
Step 5:
Last pour concrete around the posts. It is recommended to brace the instrument
to hold it rigid while the concrete cures. Leave to set according to the concrete
manufacturers guidelines. Approximately (4) 80lb. bags will be needed.
PROPRIETARY AND CONFIDENTIAL
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF
FREENOTES HARMONY PARK. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
FREENOTES HARMONY PARK IS
PROHIBITED.
FREENOTES HARMONY PARK
194 BODO DRIVE, UNIT F
DURANGO CO 81303
TEL: (970) 375-7825
FAX: (970) 247-0856
EMAIL: INFO@FREENOTESHARMONYPARK.COM
WWW.FREENOTESHARMONYPARK.COM
SHEET 3 OF 6
SCALE: 1:16
PRODUCT SHEET / INSTALLATION GUIDE
GRIFFIN 2016