Allow it to dry for 24 hours before applying the next coat. Apply the
self-adhesive fibreglass mesh before your second coat
4. Create Waterfall Effect:
For the next coat, apply a thicker layer from the edge to create a waterfall
effect for water runoff
Let this coat dry for 24 hours
Remember to follow safety guidelines and ensure the structural integrity of the rooftop
deck during each step of the process.
Notes for OSB: When attaching the OSB to your roof trusses, we recommend Flat head Self
Drilling screws #10 x 1 to 11/2” or #10 x 2” (decks) , for efficiency and advantages , Screws
are provided to attach the OSB the remaining screws can be used for your windows and
doors where needed
Start at one corner of the roof. Place the first OSB sheet, ensuring it's flush with the
edges. Cut the sheets to fit, if necessary
Secure it with screws designed for metal framing, placing screws along edges and
centre. 8 inches apart
Place subsequent OSB sheets, tightly aligned, and secure them similarly until the
entire roof is covered
Seal Joints and Gaps:
After all the sheets are installed, check for any gaps or joints between the OSB
sheets
Fill these gaps with sealant or caulk and seam tape over the joins to prevent water
infiltration and enhance the roof's overall integrity
2. Drip Edge and Fascia Installation:
Install the drip edge along the eaves of the roof. Secure it properly, ensuring it
extends slightly beyond the edge
Attach the fascia boards over the drip edge to cover the rafter ends. Cuts will be
necessary to fit, and gaps sealed to prevent water infiltration