Instructions / Assembly
3. Secure Posts and Seal Edges:
● Secure the posts for the rails in their designated positions
4. Apply the texture Coating:
● Use a roller and roll it evenly
● Refer to the manufacturer's instruction guide for specific application details
5. Apply Next Coat:
● Wait for the first coat to cure
● Apply the next coat of Rollon stone coating 6 hours later or the next day,
Please note, you can personalize the color of the deck finish by applying a
coat of paint if you require, before you apply the sealer , always follow the
manufacturer's guidelines
6. Apply Anti-Slip Sealer:
● Apply the anti-slip sealer over the entire deck surface, including the post bolts
and plates, using a roller
● Allow a minimum of 24 hours for curing, following the manufacturer's
guidelines