Instructions / Assembly

Best Practices:
Roof House Wrap: For roofs, the house wrap typically goes over the OSB, followed
by the peel-and-stick underlayment for roofing. This ensures that water shedding
from the roof doesn't get behind the house wrap
Overlap and Tape: Properly overlap house wrap seams and tape them to create a
continuous and sealed barrier. Overlapping ensures that water sheds off the wrap
and doesn't penetrate the structure
Follow the manufacturer's instructions for proper installation
Install roofing shingles as per the shingle manufacturer's guidelines
Roof Top Decks (refer to notes above)
1. Prepare OSB and Apply Membrane Coating: A clean and dry surface is crucial.
Ensure OSB is securely in place
Apply the first membrane coating on the OSB. Using a Roller and paint brush
for the corner
Let it dry for 24 hours before proceeding. Then apply the self-adhesive
fibreglass Mesh
2. Create Waterfall Effect:
Apply a thicker layer of membrane coating from the edge, creating a
waterfall effect for water runoff.
Allow this coat to dry for 24 hours.
Apply the primer provided on the membrane using a roller. Refer to the
manufacturer’s guide on the label.