Instructions / Assembly

Test the windows and doors for proper operation and make adjustments if
necessary
By following these steps and considering the manufacturer's guidelines for specific
windows, doors, flashing tape, siding, and spray foam, you can ensure a proper and
weather-resistant installation of windows and doors in your CFS structure.
Recommended Screws and Tips: Screws are provided to attach the OSB the remaining
screws can be used for your windows and doors where needed., Extra screws and
Materials will be provided.
Screw Type: Flathead self-drilling screws designed for-metal applications. Brands like
Simpson Strong-Tie, Senco, Hilti, Philips or Tapcon offer reliable products for CFS
installations
Screw Sizes: Select screw lengths based on the thickness of the door or window
frame and the CFS studs. Screws in the range of #8 to #10 x 1 to 1.5 inches long are
commonly suitable for 18-20 gauge steel studs. (provided in the steel frame kit)
Tips:
Measure Twice: Ensure accurate measurements before installing doors and
windows.
Use a Level: Always check for plumb and level during installation.
Follow Manufacturer's Instructions: Adhere to the guidelines provided by the
door and window manufacturers for installation.
Properly Shim: Shim the units correctly to avoid issues with operation and
insulation.
Remember, consulting with a professional contractor or experienced installer can provide
valuable insights, especially for your first-time installation. They can offer personalized
advice based on the specific conditions of your project.
Roof Underlayment and Shingles: Refer to the manufacturer's installation guide
Apply peel-and-stick membrane directly over the OSB and over house wrap for roof
underlayment.