Instructions / Assembly
● Generally the soffit is installed before the fascia, you can use the extra Hardie
board provided , depending on your locations requirements insulation and vents
may be required in your soffit , refer to the architectural plans
3. House Wrap Installation: Refer to the manufacturer's installation guide
● Install the house wrap over the OSB and drip edge
● Use a stapler or cap Nailer to attach the house wrap, ensuring it's taut and flat
● Overlap seams by at least 6 inches and seal them with house wrap tape for a
weather-tight barrier. Overall roof and walls
House Wrap Installation:
● Vertical Installations: Start at one corner of the house. Unroll the house wrap
vertically and staple or nail it to the top plate of the exterior wall. Ensure it's taut and
flat against the OSB
● Horizontal Installations: After the top edge is secure, work horizontally, overlapping
each subsequent layer of house wrap over the previous one by at least 6 inches.
Staple or nail the wrap to the wall studs
● Seams and Openings: Use house wrap tape to seal seams and joints in the house
wrap. Around windows and doors, cut the wrap, making sure to properly overlap
and seal the edges