Instructions / Assembly

20
LINER INSTALLATION
13
LINER
CAUTION
YOUR POOL IS DESIGNED TO PROVIDE AN
AMPLE SAFETY MARGIN WHEN IT STANDS
ON LEVEL GROUND.
FOR THIS PURPOSE A SLOPE IN EXCESS
OF 2 INCHES IN ANY DIRECTION WALL TO
WALL IS CONSIDERED OFF LEVEL.
YOUR POOL WARRANTY ONLY APPLIES
TO POOLS INSTALLED ON LEVEL
GROUND AS DEFINED ABOVE.
ONCE YOU HAVE
STARTED TO FILL
THE POOL, DO NOT
TRY TO PULL THE
LINER FORCEFULLY.
THE WEIGHT OF
EVEN ONE INCH
OF WATER WILL MAKE
IT IMPOSSIBLE TO MOVE
THE LINER WITHOUT
DAMAGING IT.
DANGER
DO NOT USE ANY MATERIAL THAT WILL COMPRESS
UNDER PRESSURE FOR THE EARTH MOUND.
SEE INSTRUCTIONS ABOVE.
Manufacturer
cannot assume
responsibility of the
performance of this
product if the earth
mound is omitted or
not properly installed.
4 - Make sure the earth mound totaly covers the
hold down sheets on the straight side of the pool.
The mound should not be less than 8 inches
high from the ground.
It is normal for the straight side of the oval
pool to lift up anywhere up to 3/4 of an inch,
leaving a gap under the buttress bottom plate.
This is normal and does not affect the
performance of your pool.
If you use less than an 8” cove or earth mound on the
straight side you will increase the possibility of the pool lifting higher.
5 - Spread the remaining sand equally across the bottom of the pool.
EARTH MOUND
8”
8”
HOLD DOWN
SHEET
VINYL LINER
TOP RAIL
PLASTIC EDGING