Instructions / Assembly

BOTTOM RAILS
2
BOTTOM RAIL
CENTER STAKE
BOTTOM PLATE
OPTIONAL
GROUND SHIELD
BOTTOM RAIL
BOTTOM
PLATE
PATIO
BLOCK
Ground Shield and Wall Guard are optional.
Spread a ground shield or plastic sheeting over
prepared ground (not included). Ground Shield
and Wall Guard are available from your local pool
supply dealer or polyethylene sheeting can be
purchased from a local hardware supply. This
will protect your pool liner and metal parts against
chemical reactions from the ground soil.
To prevent stones or other sharp objects from damaging the liner
it is recomended to build a 2” to 3”
base of sand inside the entire pool.
3 - Bring the required amount of clean
and washed masonry sand into
the pool area at this time.
Refer to chart above for the
required amount.
4 - Place the patio blocks under each
bottom plate at ground level.
5 - Check the levelness from the
center stake to each bottom plate.
1 - Mark the pool radius
(1/2 pool diameter)
using the center
stake as a reference.
2 - Form a circle by
sliding the bottom
rails with the
groove up, into the
bottom plates 1/16"
from the stop.
9
PRE WASHED SAND OR
SIFTED EARTH RECOMMENDED
REQUIREMENT CHART
POOL SIZE TONS CUBIC YARDS
12 ft. 1.7 Tons 1.1 Cu yds
15 ft. 2.3 Tons 1.5 Cu yds
18 ft. 3.2 Tons 2.1 Cu yds
21 ft. 4.1 Tons 2.7 Cu yds
24 ft. 5.3 Tons 3.5 Cu yds
27 ft. 6.5 Tons 4.3 Cu yds
30 ft. 7.8 Tons 5.2 Cu yds
33 ft. 9.3 Tons 6.2 Cu yds