Instructions / Assembly

PREPARING THE GROUND
1
CARPENTER’S
LEVEL
CLEARANCE RADIUS
CLEARANCE RADIUS
LEVEL AREA
CENTER
STAKE
NAIL
2”x 4”
1 - The pool must be installed on a solid level surface.
2 - Drive a stake into the ground at the center of your pool location.
3 - Use a length of string tied to the center stake and mark the area with spray
paint or flour using the CLEARANCE RADIUS CHART for your size pool.
4 - With the use of a leveling device and a shovel, start leveling the ground.
5 - Remove all grass and sharp objects such as sticks and stones.
6 - Level area to the lowest spot within the clearance radius.
DO NOT FILL IN LOW SPOTS.
7 - Make sure the outer part of the circle is absolutely leveled, as this is
where the bottom track and pool wall will rest.
The top of the pool must be no
less than 3' from the ground.
And the ground must remain
level for a distance of 4' away
from the pool. Refer to the
drawing above.
DO NOT FILL IN DIG AWAY HERE
CLEARANCE
RADIUS = 1/2
POOL DIAMETER + 6"
12' Pool = 6' 6"
15' Pool = 8'
18' Pool = 9' 6"
21' Pool = 11'
24' Pool = 12' 6"
27' Pool = 14'
30’ Pool = 15’ 6”
WARNING
LEVELING THE GROUND
THIS IS THE MOST IMPORTANT PART OF YOUR
PREPARATION OF THE POOL SITE. YOU MUST
GIVE CAREFUL ATTENTION TO THIS PHASE.
REMEMBER — YOUR POOL MUST BE
INSTALLED ON SOLID LEVEL SURFACE.
8
3 ft.
4 ft.