Instructions / Assembly
E-Z-ZIPTIGHT Install instructions
1) Start on the right side of the gutter, lay the back of the screen on the gutter hangers.
The back has the dip where the front is a simple curve. Push back on the front until the
screen is behind the front lip of the gutter. Then slip the screen under the front of the
gutter. It is easier to start on the right side of the screen and work down the length of
the screen.
2) Lay the next section on the gutter hangers and slide it over the notched end of the first
section, then install the screen. Continue until you get to the end of gutter. If the last
section is shorter than 14”, cut off the prior section12” to make the last section longer.
3) Miters – cut the first section ¾” long on a 45 degree, notch front and back like the
factory notches. Install. Cut second section at 45 degree, lay it over installed section
and install. Practice with scrap to ensure accurate cuts.