Manual
NOTES:
Landscape Dripline Design _____________________________________________________________
■ Installation Procedures
Installation Steps
■ Assemble and install lter, remote control valve and pressure-
regulating valve assembly(ies) according to detail numbers
1 and 2, p. 23.
■ Assemble and install supply header(s) according to detail numbers
3, 5, 4 and 6, p. 24-25. Tape or plug all open connections to
prevent debris contamination.
■ Assemble and install exhaust header(s) in accordance with detail
numbers 7 and 8, p. 26. Tape or plug all open connections to
prevent debris contamination.
■ Install dripline laterals. Tape or plug all open ends while installing
the dripline to prevent debris contamination.
■ Install air vacuum relief valve(s) at the highest point(s) of the
zone(s) according to detail numbers 9, 10, 11 and 12, p. 27-28.
(only required on subsurface installations)
■ Thoroughly ush supply header(s) and connect dripline laterals
while ushing.
■ Thoroughly ush dripline laterals and connect to exhaust header(s)
or interconnecting laterals while ushing.
■ Thoroughly ush exhaust header(s) and install line ushing valves
according to detail number 13, p. 29.
Thorough ushing of each installation segment is
necessary to ensure that no debris contamination
occurs.
22