Instructions / Assembly

6
Installation (continued)
4
Installing the 1-2- asy
Connect™
Route the junction box wires through the large
hole in the 1-2- asy Connect™ (D).
Place the 1-2- asy Connect™ (D) against the
junction box.
When mounting to a wall, the “UP” arrow
must point upward.
When mounting to an eave, the “UP” arrow
must point toward the building.
Insert the small mounting bolt (FF) through the
1-2- asy Connect™ (D) hole located below
the threaded hole, and thread it into the center
hole of the mounting bracket (GG). Tighten the
bolt (FF) securely.
Firmly pull on the 1-2- asy Connect™ to verify
it is securely attached to the mounting bracket.
FRON T
N (White/
Blanc/Blanco)
GND
Terre
Tierra
UP/Haut/Arriba
L (Black/
Noir/Negro)
FRONT
N (White/
Blanc/Blanco)
GND
Terre
Tierra
UP/Haut/Arriba
L (Black/
Noir/Negro)
5
Making the electrical
connections
Insert the junction box wires into the side of
the terminal block and around the ground
screw. Tighten terminal block screws using
the mini-screwdriver (HH) and ground screw to
secure the wires.
Insert the white wire from the junction box
into the terminal marked “N (White)”.
Insert the black wire from the junction box
into the terminal marked “L (Black)”.
Connect the bare or green ground wire
from the junction box to the ground screw
(marked with “GND”).
N (White/
Blanc/Blanco)
GND
Terre
Tierra
UP/Haut/Arriba
L (Black/
Noir/Negro)
6
Mounting the light fixture
NOTICE: The two pins on the rear of the light xture must be
inserted into the terminal block for the light to work.
Align the bottom edge of the light xture (B) with
the bottom edge of the 1-2- asy Connect™ (D)
and tilt the light xture (B) toward the
1-2- asy Connect™ (D). Ensure the light xture
(B) is centered on the 1-2- asy Connect™ (D).
Tighten the large mounting bolt (EE) securely
through the center of the 1-2- asy Connect™
(D). Do not overtighten.
Push the rubber plug (AA) rmly into the
mounting bolt hole on the light xture (B).
EE
AA
D
B
D
D
FF
GG