Instructions / Assembly

Issued/Revised:
02/02/16
FOOTING DETAIL - IN-GROUND
800.458.5872
www.ultraplay.com
23
(02-08-0188)
Parts List Footing Package -for- Playhouse Inground (02-08-0188)
PART NUMBER
QTYDESCRIPTION
ITEM
02-08-01398
FOOTBUCK ASSEMBLY
1
33-11-000316M10 x 25mm (1") BHCS BOLT2
33-11-040016
M10 LOCK NUT
3
PLACE BRICK OR EQUIVALENT
IN THE BOTTOM OF ALL
FOOTINGS TO PREVENT POST
FROM SINKING INTO THE GROUND
1
12 in
[30.48 cm]
TYP.
3
45° REF.
TYP.
2
UPRIGHT
POST
013
IMPORTANT: Never install play equipment over hard, unresilient surfaces such as asphalt, concrete,
or compacted earth. It is the owner's responsibility to ensure the "minimum area required" contains an
appropriate amount of resilient material to cushion accidental falls.
SITE PREPARATION
Clear area of any debris and level surface. Equipment is designed to be installed on a level surface
SURFACING
CONCRETE
GROUND