Instructions / Assembly

4
4.
5.
6.
a. Install side rails "B" (from End To Corner) (Fig. 7).
b.
Install side rails "C" (from Corner to Corner) (Fig. 7).
c. Ensure lock tabs are inside post (Figs. 8 & 9).
TIP
: Work your way around from End to
Corner ("B"), Corner to Corner ("C"), and
Corner to End ("B").
Corner
Posts
End
Posts
Side Rails
"B"
Side Rails
"C"
Fig. 7
Fig. 8 Fig. 9
Corner Post
"B"
"B"
"C"
End Post
Components Needed
Qty.
Side Rails "B"
10
Side Rails "C"
5
Components Needed
Qty.
Side Rails "A"
3
End
Posts
Side Rails
"A"
Fig. 10
Fig. 13
Corner
Posts
a. Install side rails "A" (from End to Corner, Corner
to Corner, and Corner To End Post) (Fig. 10).
b. Ensure lock tabs are inside post (Figs. 11 & 12).
TIP
: If side rails "A" or "B" ever need to
be removed, carefully insert a  at head
screwdriver to push locking tab down to
remove rail from post.
a. Make sure diagonal is 62
3
3
3
4
4
" and posts are level.
Adjust as needed (Fig. 13).
b. Put dry concrete into post holes (up to 80 lbs. per
post), tamping down every 3-4" of mix added.
c. Install post tops. Apply glue on inside rim of post
tops then attach to posts (Fig. 14).
Fig. 11 Fig. 12
Corner Post
End Post
"A"
"A"
"A"
Tools / Materials Needed
Level
Tape Measure
(4) Post Tops
Concrete
40
1
1
1
2
2
"
On Center
62
3
3
3
4
4
"
36
1
1
1
2
2
"
40
1
1
1
2
2
"
On
Center
Fig. 14
Level posts and complete installation