Instructions / Assembly
3
4
1
⁄
1
⁄
1
4
⁄4⁄
"
12"
Components Needed
Qty.
Corner Posts
2
End Posts
2
Tools / Materials Needed
Tape Measure
String
Stakes
Tools / Materials Needed
Shovel
Tape Measure
Level
Components Needed
Qty.
Side Rails "A"
3
1.
Measure and mark the post locations using string
and line stakes (Fig. 1).
2.
a.) Dig post holes 8" in diameter and 18" deep
(Fig. 2).
b.) Insert 6" of gravel into the bottom of holes.
Place posts in holes 12" deep (Fig. 2).
c.) Put each post in marked holes (Fig. 3).
TIP
: Make sure post heights are level, taking
into account ground slope/grade.
Fig. 1
40
1
⁄
1
⁄
1
2
⁄2⁄
"
On Center
62
3
⁄
3
⁄
3
4
⁄4⁄
"
40
1
⁄
1
⁄
1
2
⁄2⁄
"
On Center
Corner
Post
End Post
Corner
Post
End Post
Fig. 3
18"
6" Gravel
End Post
End Post
Corner Post
Corner Post
8"
Fig. 2
3.
a. Install side rails "A" (from End to Corner, Corner
to Corner, and Corner To End Post) (Fig. 4).
b. Ensure lock tabs are inside post (Figs. 5 & 6).
Corner
Posts
End
Posts
Side Rails
"A"
Fig. 4
Fig. 5 Fig. 6
Corner Post
End Post
"A"
"A"
"A"
Prepare the area for installation
Post installation
Side rail installation
12"
12"