Installation Guide
3
1.
2.
3.
Preparation
a. Lay door components on a smooth, at and
clean surface. Begin by arranging the rails in
the correct orientations.
b. Slide U-Channels onto end boards (Fig. 1).
Inserting boards into rails
a. Slide the boards into the bottom rail, starting
and ending with end boards while locking each
of them together (Fig. 2).
b. Slide the top rail over the boards (Fig. 2).
Gluing rails to upright
a. Apply provided glue to all inside surfaces of
the uprights where the rails will be installed
(Fig. 3).
b. Attach uprights to rails (Fig. 4).
U-Channel
End Board
Fig. 1
Fig. 2
U-Channel
Boards
Rail
Glue
Upright
Assembly
Fig. 3
Fig. 4