Installation Guide
3
1.
2.
3.
Bottom Rail
a. Slide brackets onto bottom rail and lift rail into
place between posts.
b. Offset bottom brackets 10" above nish grade
and center bottom rail on posts (Fig. 1).
c. Mount brackets to posts using included 4
screws per bracket. Insert white screw head
caps to hide screws (Fig. 1).
Vertical Tongue and Groove Boards
a. Insert vertical tongue and groove boards into
bottom rail from left to right.
b. Place U-Channel centered vertically on edge of
tongue and groove boards #1 and #7 (Fig. 2)
Top Rail
a. Slide brackets onto top rail and place rail on
top of vertical tongue and groove boards (Fig. 3).
b. Mount brackets to posts using included 4
screws per bracket. Insert white screw head
caps to hide screws (Fig. 3).
Fig. 1
Fig. 2
Fig. 3
U-Channel