Installation Guide
3
Bottom Rail
a. Slide brackets onto bottom rail and lift rail into place
between posts.
b. Offset bottom brackets 10" above nish grade and
center bottom rail on posts (Fig. 1).
c. Mount brackets to posts using included 4 screws
per bracket. Insert white screw head caps to hide
screws (Fig. 1).
Vertical Tongue and Groove Boards
a. Insert vertical tongue and groove boards into bottom
rail from left to right.
b. Place U-Channel centered vertically on edge of
tongue and groove boards #1 and #7 (Fig. 2)
Top Rail
a. Slide brackets onto top rail and place rail on top of
vertical tongue and groove boards (Fig. 3).
b. Mount brackets to posts using included 4 screws
per bracket. Insert white screw head caps to hide
screws (Fig. 3).
Fig. 1
Fig. 2
Fig. 3
U-Channel
1
2
3