Installation Guide

PLEASE READ THIS ENTIRE GUIDE CAREFULLY BEFORE
INSTALLING IRVING ACRYLIC BLEACH STAINED EASTERN
WHITE CEDAR SHINGLES.
IMPORTANT:
COMPLIANCE WITH IRVING ACRYLIC BLEACH STAINED CEDAR SHINGLE INSTALLATION AND STORAGE
REQUIREMENTS AS WELL AS THE APPLICABLE BUILDING CODES IN YOUR REGION IS MANDATORY.
Before installing your shingles, carefully check your order to make sure you have received the right products.
If you notice any anomalies or have any doubts about the products, DO NOT INSTALL and contact a store
representative immediately.
NOTE: The distributor will replace only defective products that have not yet been installed.
IRVING acrylic bleach stained cedar shingles are for exterior use only. They are recommended for sidewall
applications only. Roofing applications require minimum double course/layer and maximum 5" exposure.
1. STORING THE PRODUCT
• Keep the shingles in a dry and ventilated area. Theyshouldnotcomeindirectcontactwiththeground.
• Coveranyunusedshinglesintheiroriginalpackagingwhennotbeinginstalled.
2. BEFORE YOU BEGIN INSTALLATION
• Theinstalledshinglesmustnotcomeindirectcontactwiththeground,
masonry,insulationorhorizontalstructures.Ensureaminimumclearance
of6"fromtheground,3/4"frominsulationormasonry,and1"from
horizontalstructures.
• Exteriorsidingsdonotformawaterproofbarrier;besuretoinstall
aweatherbarriersuchasTYPARorTYVEKrsttoprotectfromwater
inltration.
• Installingguttersormouldingstodeectwaterawayfromtheshingles
willhelptopreventprematureagingofthenish.
3. CUTS AND FINISHING
SHINGLE INSTALLATION GUIDE
• Useasharputilityknifetocutthe
shingles.Scoreseveralstraightcuts
intotheshingle’ssurfaceandfold
alongthescoredline.Anelectric
sawcanalsobeused.
• Touchupallcutsmadetoacrylicbleachstainedcedarshingles,aswood
candeteriorateifleftunprotected.Applytouch-upstain(CABOTWaterBase
BleachingStain#10241)toallcutorplaned
surfaces,andtoallbarewood,evenifit
willnotbevisibleoncetheshingle
isinstalled.
• Usetouch-uppaintsparinglyandonlywhere
needed,suchasonbarewoodanddamaged
areas.Avoidapplyingtoomuchstain,which
willcreateanunevensheenovertimeand
indirectsunlight.
1 1/2‘’
6’’
1/2"PLYWOODOROSB
WEATHERBARRIER
STRUCTURE
2LAYERSOF
SHINGLES
CONCRETE
3/4"SPACEFOR
VENTILATION
FIGURE 1
FIGURE 2
FIGURE 3
jdirvinglumber.com

Summary of content (2 pages)