Instructions / Assembly

Pond Nozzle Kit
ITEM #NLFTN
PACKAGE CONTENTS
PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with package
contents list and diagram above. If any part is missing or damaged, do not attempt to assemble, install or
operate the product. Contact customer service for replacement parts.
Estimated Assembly Time: 5 minutes
No tools required for assembly.
ASSEMBLY INSTRUCTIONS
1. Connect the two extension tubes (A) with the coupler (B).
Fig. 1
NOTE: Use the coupler (B) if no spitters are to be used.
Fig. 1
Part
Description
Quantity
A
Extension tube
2
B
Coupler
1
C
Adapter for 1/2” outlets
1
D
Adapter for 3/4” outlets
1
E
3-tier fountain head
1
F
Trumpet fountain head
1
G
Waterbell fountain head
1
H
Foam-jet fountain head
1
I
Lower fountain head nozzle
1
J
Diverter valve
1
E
B
A
A
D
G
F
H
J
C
I
CALL 1-888-755-6750
Questions, problems, missing parts? Before returning
to your retailer, call our customer service department at
1-888-755-6750, 8 a.m.-6 p.m., EST, Monday-Friday, or
email us at customercare@thepondboss.net. Or visit our
website www.thepondboss.net.
A
B
A
PLEASE CALL 1-888-755-6750 BEFORE RETURNING TO THE STORE.
WWW.THEPONDBOSS.NET

Summary of content (4 pages)