Compatibility Chart

1. The first step to assemble the Rack will be to locate part (a) the 24” base, Part (b)
the 24” base post and part (c) the 20” base leg. The base (a) will have two welded
nuts on the bottom, they will face down. Fit the post (b) over the top of the base.
Now align the base leg (c) to the two holes on the front. Use the 3” Carraige bolts (J)
with washer and lock nuts to assemble the three pieces. Repeat for the second
tower.
2. Next assemble the leveling/anchor feet. Use part (s) with two hex nuts and part (r)
anchor. Remove a nut and add the floor anchor (r). The anchor will sandwich
between the two nuts. Lean the tower on its side. The leveling/anchor feet attach the
three welded nuts on bottom of the base tower. Repeat this step on second tower.
3. Add part (d) post to the post on the base. The welded nuts will face to the rear and
align with the holes. Use two 3/4” bolts(k) with a lock washer (n) and thick washer (o)
to assemble. Repeat on second tower.
4. Next assemble the cross bar parts (e) (f) (g). Slide the two ends (e) and (f) into the
center section (g), Use 3/4” (k) with a lock washer (n) and a thick washer (o).
6. In this step you will attach the rack arms (i) to the towers. Attach the first arm to the
lowest two holes possible. The second arm in the highest two holes. Use two 3-1/2”
bolts (m) with 2pcs washers (p) and a lock nut (q) on each to attach to the frame.
Kayak/Paddle Board Storage Rack
Assembly Instructions
5. Attach the cross section to the two assembled towers using part(h)the cross bar
plate with two 2-3/4" bolts (l) and 2pcs washers (p) and a lock nut (q) on each.This
assembled step represents the rack at the end of the tunnel. You are almost finished!