Model 4075 Box Newel Instructions

Installation With the Sleeve on Kneewall Stairway
1. Trim the bottom of the newel to the proper length. If necessary, trim
the sleeve to the desired length.
2. Slide the LJ-4175SL sleeve onto the bottom of the box newel. Mark
and drill two 1" diameter holes through the front panel of the sleeve
and into the newel face to a depth of approximately 1/4".
3. In the center of each 1" hole, drill a 3/8" diameter hole completely
through the box newel and sleeve back panel.
4. Mark and drill the appropriate pilot hole for a 5/16" x 5 1/2" lag bolt
in the end of the kneewall to correspond with the holes previously
drilled through the newel and sleeve.
5. Position the newel with sleeve against the kneewall end. Attach
with 5 1/2" lag bolts. Use glue or construction adhesive on the nal
assembly.
6. Install 1" plugs and sand.
Side View
Newel
Kneewall
Top View
5 1/2" Lag
Bolts
Sleeve
Back
Panel
1" Wood
Plugs
Sleeve
L.J. Smith Stair Systems; 35280 Scio-Bowerston Road; Bowerston, OH 44695
Phone (740) 269-2221 FAX (740) 269-9047
Copyright 2007 L.J. Smith Company
Form No. LJ-0207 INST4075