Instructions / Assembly

Install first row of block (8 units).
Using a center stake, lay out the blocks in a
16” radius from the center stake to the center
of the back of each block.
Level the blocks from front to back and side
to side.
Blocks may need to be shifted slightly in
order to get a tight fit between all the blocks
on the first course.
STEP 2 - First Row
STEP 1 - Level the Pad
Level a 48” circular area of gravel or rock on
compacted soil with the top of the pad being
1” below grade.
30" Fire Pit Kit
INSTALLATION INSTRUCTIONS
Thank you for purchasing the 30" Fire Pit Kit from
Natural Concrete Products! Our Fire Pit Kit offers a natural-looking stone profile
sure to elevate the looks of any outdoor living area.
TOOLS NEEDED FOR INSTALLATION:
9/16"Wrench
Level
Tape Measure
Shovel
3 Cubic Feet of Gravel
Caulking Gun
2 - 12oz Concrete Adhesive
**SAFETY FIRST! Before you dig, be sure to call your local utilities to mark any
underground cables and pipes in the excavated area.

Summary of content (3 pages)