Installation Guide

2
Do not install directly
over rigid foam insulation.
Do not assume your installation crews know what to do.
THE DO LIST:
Do adhere strictly to PrimeLinx Trim Boards installation and maintenance instructions
Do follow the local building code requirements
Do follow the highest building industry construction standards
Do install trim to create easy drainage planes to shed water accumulations
Do be aware of potential sources of moisture penetration, (including condensation), around the
building, and modify the design accordingly
Do re-coat all surfaces exposed by jobsite field cuts during installation
Do paint within 30 days of installation
Do re-paint in accordance with the paint manufactures written label instructions
Do make sure your installation crews know how to install PrimeLinx Trim Boards properly
PrimeLinx label is applied to the back of the product
PrimeLinx product should be installed with finish( front) face visible
C.
DO NOT USE FOR:
HAND RAILS
TRELLISES
FENCES
PLANTERS
DECKING
STAIRS (EXTERIOR)
PERGOLAS
SIDING
PrimeLinx Trim Boards are a nonstructural appearance grade deco
rative trim product and should not
be used where structural lumber properties are required. The trim is designed to be applied to
structural framing, sheathing and other materials.
D. BEFORE YOU BEGIN