Installation Guide

(A) Start at a corner; then work around the room installing the crown moulding and blocks as you come to them.
(B) Drill 3/32” holes in crown blocks. This will prevent splitting.
(C) Position crown blocks (#1 and #2) in opposite corners of the room. Be sure each crown block is pressed tightly
against the ceiling and corner.
(D) Nail pre-drilled crown blocks in place with 2” finish nails.
(E) Measure the distance between the two crown blocks (#1 and #2).